Construction Notes
The Fire Barrier is supported by three L shaped steel securing clips per1000mm length, with two clips on one side, placed at 250mm from each end, and one clip on the other side, placed centrally. The clips must penetrate to at least the mid width position on the barrier. The clips are fastened to the sides of the floor joist above the Fire Barrier, using steel nails or screws. The Fire Barrier is positioned so that the bottom of the barrier is level with the bottom of the floor joist (i.e. at top of ceiling level). There is no requirement for a fire rated ceiling.
The fire barrier must be compressed by about 5% when installed and the barrier butt ends must be tight compression joints. The maximum allowable joist spacing is 400mm nominal centres. The timber floor assembly must be in good condition and constructed in accordance with BS 5286: Part 2.
Fire Performance
The FireFloor System 2 has been assessed in accordance with BS 476 : Part 21 : 1987 by Warrington Fire Research Centre for a fire resistance period not exceeding one hour. The specifications and fixing instructions stipulated in this data sheet must be strictly adhered to.
Installation
The FireFloor System 2 is installed, from above, into the space between floors joists; in the case of refurbishment the floor boards must be removed, but the ceiling may be left in place. Clips are inserted into the AIM Fire Barrier at mid thickness with the leg pointing upwards. The Fire Barrier is compressed by about 5% into the space between floor joists, and pushed down until the bottom of the barrier is in line with the bottom of the floor joists.
The clips, which will be protruding above the fire barrier are then to be fixed to the floor joists with steel nails or screws.